Clayfields

-Site wide reduced level dig
-Installation of under slab drainage
-Installation of pile caps and ground beam foundations
-Installation of ground floor slab
-Installation of first floor slab to permanent formwork
-Completion of all internal and external drainage
-Installation of Tubosider attenuation system
-Installation of hard landscaping
-Soft landscaping