Broseley Rising Main

Brief description of works carried out:-
-Completion of trial holes to identify existing services and define a route along an already congested highway
-Installation of 1200m of 315mm HDPE pumping main using a mixture of Butt fusion and Electro fusion techniques
-5 cross connections to existing pipe work via both shutdown and live connection techniques
-Full width carriageway reinstatement to 500m of the route
-Installation of associated valve chambers in both pre cast concrete and brickwork
-Connection to existing shafts