Brent Cross Station South Entrance

Brief description of works carried out:-
Creation of the sub-structure and super-structure of new station entrance building
-Installation of under slab drainage
-Breaking down of piles and installation of pile caps
-Installation of lift pit
-Formwork, reinforcement and concrete to building slab
-Formwork, concrete and reinforcement to lift shaft and building walls, all completed with high spec finish for final public realm works