{"id":1014,"date":"2026-04-10T08:12:38","date_gmt":"2026-04-10T08:12:38","guid":{"rendered":"https:\/\/plscivilengineering.com\/?p=1014"},"modified":"2026-04-10T08:12:40","modified_gmt":"2026-04-10T08:12:40","slug":"refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot","status":"publish","type":"post","link":"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/","title":{"rendered":"Refuelling Area Remediation and Track Slab Installation at LORAM Train Depot"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<p><strong>Client:<\/strong> Trackwork LTD<br><strong>Principal Contractor:<\/strong> PLS Civil Engineering Ltd<br><strong>Project Date:<\/strong> Late 2025<br><strong>Location:<\/strong> LORAM Train Depot<\/p>\n\n\n\n<p>PLS Civil Engineering Ltd was appointed to deliver a critical remediation and infrastructure upgrade project at the LORAM train depot on behalf of our valued client, Trackwork LTD. The project was designed to address a long-standing issue within the depot\u2019s refuelling area, where historical fuel spillages had caused significant ground contamination. This project required a rapid and robust civil engineering solution to both remediate the existing environment and provide a future-proofed refuelling zone that would prevent further damage to the sub-strata.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">The Challenge<\/h4>\n\n\n\n<p>The primary challenge at the LORAM depot was a persistent environmental issue where fuel from the refuelling process was penetrating the railway ballast and sub-soil. This required a high-pressure delivery strategy centered around a 14-day blockade with a 24\/7 working schedule. The team had to coordinate seamlessly with Trackwork LTD to manage the transition between rail removal and complex civil construction. Returning the depot to operational status as quickly as possible was paramount, meaning there was no margin for error in the excavation of contaminated materials or the rapid pour of new structural slabs.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Project Scope and Execution<\/h4>\n\n\n\n<p>The project was delivered across two distinct phases to maximize efficiency and minimize operational downtime. During the initial 14-day blockade, PLS Civil Engineering Ltd worked around the clock to remove the contaminated ballast and sub-soil immediately after the rail was cleared. Following the remediation, our teams constructed eight high-strength track slabs involving the pour of approximately 80 cubic meters of concrete. To ensure long-term environmental protection, we installed integrated drainage gullies and pipework directly within these slabs. This allowed Trackwork LTD to install new rail on top of a fresh, sealed formation that was designed to capture and divert any future fuel spillages at the source.<\/p>\n\n\n\n<p>Following the successful completion of the blockade, the second phase of the project focused on the wider drainage infrastructure during midweek working hours over a three-week period. This phase involved the installation of a new interceptor system designed specifically to separate and manage fuel runoff from the refuelling area. Our team installed a comprehensive drainage network including several new chambers and a final connection into the existing site drainage. The project concluded with the commissioning of the interceptor and the full reinstatement of the tarmac surfacing to return the area to a clean and functional state.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Delivery and Results<\/h4>\n\n\n\n<p>The project was managed with a focus on collaborative sequencing and disciplined programme management. By integrating the drainage infrastructure directly into the slab construction during the blockade, PLS Civil Engineering Ltd provided a dual-purpose solution that offered both structural stability for the track and an immediate environmental safeguard. The use of specialized concrete ensured that the depot could return to service within the strict possession window provided by the client.<\/p>\n\n\n\n<p>The final results were highly successful, resulting in the complete removal of historical contamination and the delivery of a modern, resilient refuelling asset. The project demonstrated the ability of PLS Civil Engineering Ltd to handle complex, time-sensitive remediation works within a live rail environment while prioritizing environmental compliance and client satisfaction. The new interceptor system and slab-integrated drainage now provide the LORAM depot with a long-term solution that protects the ground from future spillages, supporting the ongoing operational efficiency of our client, Trackwork LTD.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"1020\" src=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/IMG_0762-768x1024.jpeg\" alt=\"\" class=\"wp-image-1020\" srcset=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/IMG_0762-768x1024.jpeg 768w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/IMG_0762-225x300.jpeg 225w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/IMG_0762-1152x1536.jpeg 1152w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/IMG_0762-1536x2048.jpeg 1536w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/IMG_0762-scaled.jpeg 1920w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"1018\" src=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/28688985-e7b3-4b07-bf94-9a5261500e3b-768x1024.jpg\" alt=\"\" class=\"wp-image-1018\" srcset=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/28688985-e7b3-4b07-bf94-9a5261500e3b-768x1024.jpg 768w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/28688985-e7b3-4b07-bf94-9a5261500e3b-225x300.jpg 225w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/28688985-e7b3-4b07-bf94-9a5261500e3b-1152x1536.jpg 1152w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/28688985-e7b3-4b07-bf94-9a5261500e3b.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"1017\" src=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/473a8823-edcb-4632-ba1c-2848ffcb01e8-768x1024.jpg\" alt=\"\" class=\"wp-image-1017\" srcset=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/473a8823-edcb-4632-ba1c-2848ffcb01e8-768x1024.jpg 768w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/473a8823-edcb-4632-ba1c-2848ffcb01e8-225x300.jpg 225w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/473a8823-edcb-4632-ba1c-2848ffcb01e8-1152x1536.jpg 1152w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/473a8823-edcb-4632-ba1c-2848ffcb01e8.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"1016\" src=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/7d57fa45-ae85-411a-ad3b-319e429c7f9e-768x1024.jpg\" alt=\"\" class=\"wp-image-1016\" srcset=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/7d57fa45-ae85-411a-ad3b-319e429c7f9e-768x1024.jpg 768w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/7d57fa45-ae85-411a-ad3b-319e429c7f9e-225x300.jpg 225w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/7d57fa45-ae85-411a-ad3b-319e429c7f9e-1152x1536.jpg 1152w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/7d57fa45-ae85-411a-ad3b-319e429c7f9e.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"1015\" src=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/0ebed46d-758e-42ae-8f2f-0611357960c0-768x1024.jpg\" alt=\"\" class=\"wp-image-1015\" srcset=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/0ebed46d-758e-42ae-8f2f-0611357960c0-768x1024.jpg 768w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/0ebed46d-758e-42ae-8f2f-0611357960c0-225x300.jpg 225w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/0ebed46d-758e-42ae-8f2f-0611357960c0-1152x1536.jpg 1152w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/0ebed46d-758e-42ae-8f2f-0611357960c0.jpg 1200w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Client: Trackwork LTDPrincipal Contractor: PLS Civil Engineering LtdProject Date: Late 2025Location: LORAM Train Depot PLS Civil Engineering Ltd was appointed to deliver a critical remediation and infrastructure upgrade project at the LORAM train depot on behalf of our valued client, Trackwork LTD. The project was designed to address a long-standing issue within the depot\u2019s refuelling<\/p>\n<p class=\"more-link\"><a href=\"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/\" class=\"themebutton2\">Read More<\/a><\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-1014","post","type-post","status-publish","format-standard","hentry","category-civ"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Refuelling Area Remediation and Track Slab Installation at LORAM Train Depot - PLS Civil Engineering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Refuelling Area Remediation and Track Slab Installation at LORAM Train Depot - PLS Civil Engineering\" \/>\n<meta property=\"og:description\" content=\"Client: Trackwork LTDPrincipal Contractor: PLS Civil Engineering LtdProject Date: Late 2025Location: LORAM Train Depot PLS Civil Engineering Ltd was appointed to deliver a critical remediation and infrastructure upgrade project at the LORAM train depot on behalf of our valued client, Trackwork LTD. The project was designed to address a long-standing issue within the depot\u2019s refuellingRead More\" \/>\n<meta property=\"og:url\" content=\"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/\" \/>\n<meta property=\"og:site_name\" content=\"PLS Civil Engineering\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-10T08:12:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-10T08:12:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/IMG_0762-scaled.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"2560\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Hayden Swann\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Hayden Swann\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/04\\\/10\\\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/04\\\/10\\\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\\\/\"},\"author\":{\"name\":\"Hayden Swann\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#\\\/schema\\\/person\\\/1ab5b9b17e088696b8ea109863de3bea\"},\"headline\":\"Refuelling Area Remediation and Track Slab Installation at LORAM Train Depot\",\"datePublished\":\"2026-04-10T08:12:38+00:00\",\"dateModified\":\"2026-04-10T08:12:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/04\\\/10\\\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\\\/\"},\"wordCount\":566,\"publisher\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/04\\\/10\\\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/plscivilengineering.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/IMG_0762-768x1024.jpeg\",\"articleSection\":[\"Civil Posts\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/04\\\/10\\\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\\\/\",\"url\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/04\\\/10\\\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\\\/\",\"name\":\"Refuelling Area Remediation and Track Slab Installation at LORAM Train Depot - PLS Civil Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/04\\\/10\\\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/04\\\/10\\\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/plscivilengineering.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/IMG_0762-768x1024.jpeg\",\"datePublished\":\"2026-04-10T08:12:38+00:00\",\"dateModified\":\"2026-04-10T08:12:40+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/04\\\/10\\\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/04\\\/10\\\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/04\\\/10\\\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\\\/#primaryimage\",\"url\":\"https:\\\/\\\/plscivilengineering.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/IMG_0762-scaled.jpeg\",\"contentUrl\":\"https:\\\/\\\/plscivilengineering.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/IMG_0762-scaled.jpeg\",\"width\":1920,\"height\":2560},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/04\\\/10\\\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/plscivilengineering.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Refuelling Area Remediation and Track Slab Installation at LORAM Train Depot\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#website\",\"url\":\"https:\\\/\\\/plscivilengineering.com\\\/\",\"name\":\"PLS Civil Engineering\",\"description\":\"Specialist Civil Solutions\",\"publisher\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/plscivilengineering.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#organization\",\"name\":\"PLS Civil Engineering Ltd\",\"url\":\"https:\\\/\\\/plscivilengineering.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"http:\\\/\\\/plscivilengineering.com\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/cropped-logxs-1.jpg\",\"contentUrl\":\"http:\\\/\\\/plscivilengineering.com\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/cropped-logxs-1.jpg\",\"width\":498,\"height\":288,\"caption\":\"PLS Civil Engineering Ltd\"},\"image\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/pls-civil-engineering-limited\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#\\\/schema\\\/person\\\/1ab5b9b17e088696b8ea109863de3bea\",\"name\":\"Hayden Swann\",\"url\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/author\\\/haydenplscivilengineering-com\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Refuelling Area Remediation and Track Slab Installation at LORAM Train Depot - PLS Civil Engineering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/","og_locale":"en_GB","og_type":"article","og_title":"Refuelling Area Remediation and Track Slab Installation at LORAM Train Depot - PLS Civil Engineering","og_description":"Client: Trackwork LTDPrincipal Contractor: PLS Civil Engineering LtdProject Date: Late 2025Location: LORAM Train Depot PLS Civil Engineering Ltd was appointed to deliver a critical remediation and infrastructure upgrade project at the LORAM train depot on behalf of our valued client, Trackwork LTD. The project was designed to address a long-standing issue within the depot\u2019s refuellingRead More","og_url":"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/","og_site_name":"PLS Civil Engineering","article_published_time":"2026-04-10T08:12:38+00:00","article_modified_time":"2026-04-10T08:12:40+00:00","og_image":[{"width":1920,"height":2560,"url":"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/IMG_0762-scaled.jpeg","type":"image\/jpeg"}],"author":"Hayden Swann","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Hayden Swann","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/#article","isPartOf":{"@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/"},"author":{"name":"Hayden Swann","@id":"https:\/\/plscivilengineering.com\/#\/schema\/person\/1ab5b9b17e088696b8ea109863de3bea"},"headline":"Refuelling Area Remediation and Track Slab Installation at LORAM Train Depot","datePublished":"2026-04-10T08:12:38+00:00","dateModified":"2026-04-10T08:12:40+00:00","mainEntityOfPage":{"@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/"},"wordCount":566,"publisher":{"@id":"https:\/\/plscivilengineering.com\/#organization"},"image":{"@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/#primaryimage"},"thumbnailUrl":"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/IMG_0762-768x1024.jpeg","articleSection":["Civil Posts"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/","url":"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/","name":"Refuelling Area Remediation and Track Slab Installation at LORAM Train Depot - PLS Civil Engineering","isPartOf":{"@id":"https:\/\/plscivilengineering.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/#primaryimage"},"image":{"@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/#primaryimage"},"thumbnailUrl":"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/IMG_0762-768x1024.jpeg","datePublished":"2026-04-10T08:12:38+00:00","dateModified":"2026-04-10T08:12:40+00:00","breadcrumb":{"@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/#primaryimage","url":"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/IMG_0762-scaled.jpeg","contentUrl":"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/04\/IMG_0762-scaled.jpeg","width":1920,"height":2560},{"@type":"BreadcrumbList","@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/04\/10\/refuelling-area-remediation-and-track-slab-installation-at-loram-train-depot\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/plscivilengineering.com\/"},{"@type":"ListItem","position":2,"name":"Refuelling Area Remediation and Track Slab Installation at LORAM Train Depot"}]},{"@type":"WebSite","@id":"https:\/\/plscivilengineering.com\/#website","url":"https:\/\/plscivilengineering.com\/","name":"PLS Civil Engineering","description":"Specialist Civil Solutions","publisher":{"@id":"https:\/\/plscivilengineering.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/plscivilengineering.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/plscivilengineering.com\/#organization","name":"PLS Civil Engineering Ltd","url":"https:\/\/plscivilengineering.com\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/plscivilengineering.com\/#\/schema\/logo\/image\/","url":"http:\/\/plscivilengineering.com\/wp-content\/uploads\/2019\/11\/cropped-logxs-1.jpg","contentUrl":"http:\/\/plscivilengineering.com\/wp-content\/uploads\/2019\/11\/cropped-logxs-1.jpg","width":498,"height":288,"caption":"PLS Civil Engineering Ltd"},"image":{"@id":"https:\/\/plscivilengineering.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/pls-civil-engineering-limited\/"]},{"@type":"Person","@id":"https:\/\/plscivilengineering.com\/#\/schema\/person\/1ab5b9b17e088696b8ea109863de3bea","name":"Hayden Swann","url":"https:\/\/plscivilengineering.com\/index.php\/author\/haydenplscivilengineering-com\/"}]}},"_links":{"self":[{"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/posts\/1014","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/comments?post=1014"}],"version-history":[{"count":1,"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/posts\/1014\/revisions"}],"predecessor-version":[{"id":1021,"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/posts\/1014\/revisions\/1021"}],"wp:attachment":[{"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/media?parent=1014"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/categories?post=1014"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/tags?post=1014"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}