{"id":978,"date":"2026-03-06T11:51:12","date_gmt":"2026-03-06T11:51:12","guid":{"rendered":"https:\/\/plscivilengineering.com\/?p=978"},"modified":"2026-03-06T11:51:15","modified_gmt":"2026-03-06T11:51:15","slug":"delivering-54km-of-onshore-ducting-for-hornsea-3","status":"publish","type":"post","link":"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/","title":{"rendered":"Delivering 54km of Onshore Ducting for Hornsea 3"},"content":{"rendered":"\n<p>The Hornsea 3 offshore wind farm is a landmark project in the UK\u2019s renewable energy strategy, designed to provide clean power to millions of homes. A project of this magnitude requires a massive onshore infrastructure network to transport electricity from the coast to the national grid. PLS was appointed by VolkerFitzpatrick to deliver a critical portion of this onshore link, involving a vast network of cable ducting and specialized joint bays.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">The Project Challenge<\/h4>\n\n\n\n<p>The scale of the Hornsea 3 onshore works was immense. The project required the installation of 54km of onshore ducting across varied and often challenging terrain. For a project of this length, consistency is the biggest challenge because every meter of duct must be laid to exact gradients and alignments. This ensures that miles of high voltage cabling can be pulled through without snagging or damage during the later stages of the project.<\/p>\n\n\n\n<p>In addition to the main duct runs, the scope included the construction of 50 joint bays. These are large, reinforced underground structures where separate sections of cable are spliced together. They are high precision civil engineering elements that must be perfectly level, clean, and structurally sound to house sensitive electrical components for decades to come.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Our Role: Precision at Scale<\/h4>\n\n\n\n<p>Working as a key partner to VolkerFitzpatrick, PLS took responsibility for the end to end civils delivery of the ducting network. Our approach focused on high productivity output without sacrificing the technical accuracy required for major utility infrastructure.<\/p>\n\n\n\n<p>The work involved a massive logistical operation to manage the excavation, bedding, and laying of 54km of ducting. We ensured materials were always at the work face and that open trenches were managed safely across the entire route. We also constructed 50 joint bays at strategic intervals, building each to rigorous specifications to provide the necessary space and protection for the cable jointing teams who followed our work.<\/p>\n\n\n\n<p>In the world of cable ducting, quality assurance is vital. We implemented strict checks to ensure no debris entered the ducts and that all couplings were secure, preventing future blockages or water ingress that could delay the cable pulling phase.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Delivery and Performance<\/h4>\n\n\n\n<p>On a project this large, staying on schedule is vital to the wider project timeline. Any delay in the civils work would have a knock on effect on the cabling teams and the eventual commissioning of the wind farm. PLS delivered the entire 54km scope and all 50 joint bays exactly on time and strictly within the allocated budget. This was achieved through disciplined site management, clear communication with VolkerFitzpatrick, and a commitment to hitting daily production targets.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Client Feedback and Quality Standards<\/h4>\n\n\n\n<p>The ultimate measure of success for a ducting project is proving the ducts are clear and correctly shaped for the cables. Our commitment to quality meant that the installation exceeded expectations. VolkerFitzpatrick commented that the ducts were installed to the highest of standards. This level of praise on a major infrastructure project is a testament to the skill of our site teams and our focus on doing the job right the first time. By delivering a clean network, we ensured that the subsequent cable pulling phase could proceed without technical hitches.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Why It Matters<\/h4>\n\n\n\n<p>The Hornsea 3 project demonstrates that PLS has the capacity, equipment, and expertise to handle the UK\u2019s largest utility and renewable energy schemes. We proved we can manage linear projects exceeding 50km with multiple work fronts while delivering on our promises regarding both time and budget. Most importantly, we provided a finished product that earned direct praise from a Tier 1 contractor. Our work on Hornsea 3 is about building the backbone of the UK\u2019s green energy future, and we are proud to have played a key role in such a significant piece of national infrastructure.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240730_122617-1024x768.jpg\" alt=\"\" class=\"wp-image-984\" srcset=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240730_122617-1024x768.jpg 1024w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240730_122617-300x225.jpg 300w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240730_122617-768x576.jpg 768w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240730_122617-1536x1152.jpg 1536w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240730_122617-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240502_171942-1024x768.jpg\" alt=\"\" class=\"wp-image-979\" srcset=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240502_171942-1024x768.jpg 1024w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240502_171942-300x225.jpg 300w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240502_171942-768x576.jpg 768w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240502_171942-1536x1152.jpg 1536w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240502_171942-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240514_132642-768x1024.jpg\" alt=\"\" class=\"wp-image-980\" srcset=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240514_132642-768x1024.jpg 768w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240514_132642-225x300.jpg 225w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240514_132642-1152x1536.jpg 1152w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240514_132642-1536x2048.jpg 1536w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240514_132642-scaled.jpg 1920w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240608_085312-1024x768.jpg\" alt=\"\" class=\"wp-image-982\" srcset=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240608_085312-1024x768.jpg 1024w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240608_085312-300x225.jpg 300w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240608_085312-768x576.jpg 768w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240608_085312-1536x1152.jpg 1536w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240608_085312-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240702_1239021-1024x768.jpg\" alt=\"\" class=\"wp-image-983\" srcset=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240702_1239021-1024x768.jpg 1024w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240702_1239021-300x225.jpg 300w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240702_1239021-768x576.jpg 768w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240702_1239021-1536x1152.jpg 1536w, https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240702_1239021-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The Hornsea 3 offshore wind farm is a landmark project in the UK\u2019s renewable energy strategy, designed to provide clean power to millions of homes. A project of this magnitude requires a massive onshore infrastructure network to transport electricity from the coast to the national grid. PLS was appointed by VolkerFitzpatrick to deliver a critical<\/p>\n<p class=\"more-link\"><a href=\"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/\" class=\"themebutton2\">Read More<\/a><\/p>\n","protected":false},"author":4,"featured_media":985,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-978","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-civ"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Delivering 54km of Onshore Ducting for Hornsea 3 - PLS Civil Engineering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Delivering 54km of Onshore Ducting for Hornsea 3 - PLS Civil Engineering\" \/>\n<meta property=\"og:description\" content=\"The Hornsea 3 offshore wind farm is a landmark project in the UK\u2019s renewable energy strategy, designed to provide clean power to millions of homes. A project of this magnitude requires a massive onshore infrastructure network to transport electricity from the coast to the national grid. PLS was appointed by VolkerFitzpatrick to deliver a criticalRead More\" \/>\n<meta property=\"og:url\" content=\"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/\" \/>\n<meta property=\"og:site_name\" content=\"PLS Civil Engineering\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-06T11:51:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-06T11:51:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240730_122618-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Hayden Swann\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Hayden Swann\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/03\\\/06\\\/delivering-54km-of-onshore-ducting-for-hornsea-3\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/03\\\/06\\\/delivering-54km-of-onshore-ducting-for-hornsea-3\\\/\"},\"author\":{\"name\":\"Hayden Swann\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#\\\/schema\\\/person\\\/1ab5b9b17e088696b8ea109863de3bea\"},\"headline\":\"Delivering 54km of Onshore Ducting for Hornsea 3\",\"datePublished\":\"2026-03-06T11:51:12+00:00\",\"dateModified\":\"2026-03-06T11:51:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/03\\\/06\\\/delivering-54km-of-onshore-ducting-for-hornsea-3\\\/\"},\"wordCount\":631,\"publisher\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/03\\\/06\\\/delivering-54km-of-onshore-ducting-for-hornsea-3\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/plscivilengineering.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/20240730_122618-scaled.jpg\",\"articleSection\":[\"Civil Posts\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/03\\\/06\\\/delivering-54km-of-onshore-ducting-for-hornsea-3\\\/\",\"url\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/03\\\/06\\\/delivering-54km-of-onshore-ducting-for-hornsea-3\\\/\",\"name\":\"Delivering 54km of Onshore Ducting for Hornsea 3 - PLS Civil Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/03\\\/06\\\/delivering-54km-of-onshore-ducting-for-hornsea-3\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/03\\\/06\\\/delivering-54km-of-onshore-ducting-for-hornsea-3\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/plscivilengineering.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/20240730_122618-scaled.jpg\",\"datePublished\":\"2026-03-06T11:51:12+00:00\",\"dateModified\":\"2026-03-06T11:51:15+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/03\\\/06\\\/delivering-54km-of-onshore-ducting-for-hornsea-3\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/03\\\/06\\\/delivering-54km-of-onshore-ducting-for-hornsea-3\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/03\\\/06\\\/delivering-54km-of-onshore-ducting-for-hornsea-3\\\/#primaryimage\",\"url\":\"https:\\\/\\\/plscivilengineering.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/20240730_122618-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/plscivilengineering.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/20240730_122618-scaled.jpg\",\"width\":2560,\"height\":1920},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/2026\\\/03\\\/06\\\/delivering-54km-of-onshore-ducting-for-hornsea-3\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/plscivilengineering.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Delivering 54km of Onshore Ducting for Hornsea 3\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#website\",\"url\":\"https:\\\/\\\/plscivilengineering.com\\\/\",\"name\":\"PLS Civil Engineering\",\"description\":\"Specialist Civil Solutions\",\"publisher\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/plscivilengineering.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#organization\",\"name\":\"PLS Civil Engineering Ltd\",\"url\":\"https:\\\/\\\/plscivilengineering.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"http:\\\/\\\/plscivilengineering.com\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/cropped-logxs-1.jpg\",\"contentUrl\":\"http:\\\/\\\/plscivilengineering.com\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/cropped-logxs-1.jpg\",\"width\":498,\"height\":288,\"caption\":\"PLS Civil Engineering Ltd\"},\"image\":{\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/pls-civil-engineering-limited\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/plscivilengineering.com\\\/#\\\/schema\\\/person\\\/1ab5b9b17e088696b8ea109863de3bea\",\"name\":\"Hayden Swann\",\"url\":\"https:\\\/\\\/plscivilengineering.com\\\/index.php\\\/author\\\/haydenplscivilengineering-com\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Delivering 54km of Onshore Ducting for Hornsea 3 - PLS Civil Engineering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/","og_locale":"en_GB","og_type":"article","og_title":"Delivering 54km of Onshore Ducting for Hornsea 3 - PLS Civil Engineering","og_description":"The Hornsea 3 offshore wind farm is a landmark project in the UK\u2019s renewable energy strategy, designed to provide clean power to millions of homes. A project of this magnitude requires a massive onshore infrastructure network to transport electricity from the coast to the national grid. PLS was appointed by VolkerFitzpatrick to deliver a criticalRead More","og_url":"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/","og_site_name":"PLS Civil Engineering","article_published_time":"2026-03-06T11:51:12+00:00","article_modified_time":"2026-03-06T11:51:15+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240730_122618-scaled.jpg","type":"image\/jpeg"}],"author":"Hayden Swann","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Hayden Swann","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/#article","isPartOf":{"@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/"},"author":{"name":"Hayden Swann","@id":"https:\/\/plscivilengineering.com\/#\/schema\/person\/1ab5b9b17e088696b8ea109863de3bea"},"headline":"Delivering 54km of Onshore Ducting for Hornsea 3","datePublished":"2026-03-06T11:51:12+00:00","dateModified":"2026-03-06T11:51:15+00:00","mainEntityOfPage":{"@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/"},"wordCount":631,"publisher":{"@id":"https:\/\/plscivilengineering.com\/#organization"},"image":{"@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/#primaryimage"},"thumbnailUrl":"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240730_122618-scaled.jpg","articleSection":["Civil Posts"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/","url":"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/","name":"Delivering 54km of Onshore Ducting for Hornsea 3 - PLS Civil Engineering","isPartOf":{"@id":"https:\/\/plscivilengineering.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/#primaryimage"},"image":{"@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/#primaryimage"},"thumbnailUrl":"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240730_122618-scaled.jpg","datePublished":"2026-03-06T11:51:12+00:00","dateModified":"2026-03-06T11:51:15+00:00","breadcrumb":{"@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/#primaryimage","url":"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240730_122618-scaled.jpg","contentUrl":"https:\/\/plscivilengineering.com\/wp-content\/uploads\/2026\/03\/20240730_122618-scaled.jpg","width":2560,"height":1920},{"@type":"BreadcrumbList","@id":"https:\/\/plscivilengineering.com\/index.php\/2026\/03\/06\/delivering-54km-of-onshore-ducting-for-hornsea-3\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/plscivilengineering.com\/"},{"@type":"ListItem","position":2,"name":"Delivering 54km of Onshore Ducting for Hornsea 3"}]},{"@type":"WebSite","@id":"https:\/\/plscivilengineering.com\/#website","url":"https:\/\/plscivilengineering.com\/","name":"PLS Civil Engineering","description":"Specialist Civil Solutions","publisher":{"@id":"https:\/\/plscivilengineering.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/plscivilengineering.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/plscivilengineering.com\/#organization","name":"PLS Civil Engineering Ltd","url":"https:\/\/plscivilengineering.com\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/plscivilengineering.com\/#\/schema\/logo\/image\/","url":"http:\/\/plscivilengineering.com\/wp-content\/uploads\/2019\/11\/cropped-logxs-1.jpg","contentUrl":"http:\/\/plscivilengineering.com\/wp-content\/uploads\/2019\/11\/cropped-logxs-1.jpg","width":498,"height":288,"caption":"PLS Civil Engineering Ltd"},"image":{"@id":"https:\/\/plscivilengineering.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/pls-civil-engineering-limited\/"]},{"@type":"Person","@id":"https:\/\/plscivilengineering.com\/#\/schema\/person\/1ab5b9b17e088696b8ea109863de3bea","name":"Hayden Swann","url":"https:\/\/plscivilengineering.com\/index.php\/author\/haydenplscivilengineering-com\/"}]}},"_links":{"self":[{"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/posts\/978","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/comments?post=978"}],"version-history":[{"count":1,"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/posts\/978\/revisions"}],"predecessor-version":[{"id":986,"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/posts\/978\/revisions\/986"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/media\/985"}],"wp:attachment":[{"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/media?parent=978"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/categories?post=978"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/plscivilengineering.com\/index.php\/wp-json\/wp\/v2\/tags?post=978"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}