Loughborough University
New district heating main, utilities and no-dig crossing at a university.
New district heating main, utilities and no-dig crossing at a university.
Platform extensions to an existing rail depot including track slabs, drainage, services and sub station structure.
Construction of concrete outlet on existing aqueduct, installation of 1km of 1050mm pipe and new river outlet with dissipation structure.
Site investigation, demolition of foundations, new foundations and sub station, drainage and utilities in existing enclosed site.
Foundations, slab, drainage, services and permeable playground for a new school building.
Reduced dig and formation for slab, new slab, drainage and services on a new school building.
Muck shift, piling platform, new structures, sports field, drainage and services for a new school building.
New slabs, drainage and landscaping
4500Ø 6m deep chamber with under pressure connection and associated pipework.
New access road, drainage, services and block paving repairs to a Royal Mail depot.